36. A well drilling licensee shall, during or after the drilling of a well, carry out directional deviation surveys when the well reaches a deviation in inclination or orientation exceeding the projection in the drilling program required under section 15 by more than 10 degrees.
O.C. 1539-88, s. 36; O.C. 1381-2009, s. 21.